Drake, Kelly (2011) What I Did Over Winter Break: Switching from SFX 3 to SFX 4. In: ELUNA 2011, 11-13 May 2011, Milwaukee, Wisconsin.
|
Microsoft PowerPoint
- Presentation
Restricted to Registered users only 3MB |
Abstract
The 11 SFX 4 instances of Fenway Libraries Online went live Dec 22, 2010. Using this upgrade as a prototype, this talk outlines the application of simplified project management techniques to the process. This session will discuss the SFX- specific initiation, planning, execution, monitoring and closing phases, as well as how to create a timeline, assess and set training needs, manage the technical process, plan for the ‘cone of uncertainty’ and still have time to play in the snow.
| Item Type: | Conference or Workshop Item (Lecture) |
|---|---|
| Event Title: | ELUNA 2011 |
| Subjects: | SFX |
| Divisions: | ELUNA Conference Proceedings |
| ID Code: | 696 |
| Deposited By: | INVALID USER |
| Deposited On: | 31 May 2011 16:40 |
| Last Modified: | 27 May 2016 21:05 |
Repository Staff Only: item control page
